The railway system is one of the company's main strategic partners. The test blocks used for the inspection of rail in service, the inspection of locomotive axle and the inspection of locomotive wheels are all manufactured by our company. Our company has been the Ministry of Railways maintenance system "product quality recognition" for decades, is currently the Ministry of Railways non-destructive testing ultrasonic test block only designated unit.
With the increase of train running speed, higher requirements are put forward for the flaw detection grade and inspection technology of rail, wheel and axle. In order to ensure the safety of train operation, a large number of high-quality flaw detection blocks are needed. Our company undertook this task and completed it with quality and quantity guarantee, ensuring the safe operation of the train after the speed increase.
On December 26, 2009, the Wuguang section of the Beijing-Hong Kong high-speed Railway was put into operation. This is the world's longest completed high-speed rail line, the most complex type of engineering, and a speed of 350 kilometers per hour. This marks the beginning of the era of high-speed rail in China. The improvement of high-speed rail speed has promoted the rapid development of economy, but also increased the safety risks of train operation. High-speed rail uses hollow axle technology to reduce weight and increase train speed. At that time, the flaw detection of hollow axle was still a blind spot in China. Recommended by experts of the Ministry of Railways, our company cooperated with well-known domestic enterprises to complete the research and production of hollow axle detection. Now all the hollow axle detection test blocks of high-speed rail in China are produced by our company. The large increase of train running speed puts forward higher requirements for the inspection grade and inspection process of rail, wheel, axle, etc. Our company timely develops and provides high-quality inspection blocks of rail, wheel, axle, etc., to ensure the safe operation of trains after the speed increase.
The cooperation units are: Beijing Railway Bureau, Shanghai Railway Bureau, Zhengzhou Railway Bureau, Lanzhou Railway Bureau, Kunming Railway Bureau, Chengdu Railway Bureau, Jinan Railway Bureau, Nanning Railway Bureau, Harbin Railway Bureau, Taiyuan Railway Bureau, Urumqi Railway Bureau, Qinghai-Tibet Railway Company, Daqin Railway Co., LTD. Anshan Steel Co., LTD., Panzhihua Steel Vanadium Co., LTD. Rail and beam factory, Baogang Steel Union Co., LTD. Rail and beam rolling mill, Wuhan Iron and Steel Group Bar General plant, Anshan No. 3 Steel Rolling Co., LTD., Handan Branch of Hebei Iron and Steel Co., LTD., are also our main strategic partners. The sample rails for online rail production line are all processed by our company.
Test block for nondestructive testing of public works systemRail weld ultrasonic inspection operation TB/T2658.21-2007(1) The standard test block should be manufactured by a qualified professional manufacturer, and can be used after testing, mainly for indoor detection system sensitivity
Degree. The standard test blocks are CS-1-5# block and CSK-1A block.
(2) The comparison block is made of 60kg/m new rail.
①, GHT-1ab double probe test block The artificial defects of the test block are processed at both ends of the test block, see Figure 1-16.
②, GHT-5 single probe test block Test block A, B and C three areas are equal to TB/T1632.1 standard GHT-2,
GHT-3 and GHT-4, as shown in Figure 1-17.
Figure 1-17 GHT-5